门头施工方案
录目施工组织设计................................................................................................................2
1、编制目的及依据......................................................................................................3
1.1、编制目的..............................................................................................................3
1.2、编制内容..............................................................................................................3
1.3、编制依据..............................................................................................................3
1.4、编制原则..............................................................................................................4
2、工程概况..................................................................................................................5
3、工程特点分析..........................................................................................................5
4、施工部署..................................................................................................................6
4.1、实施目标..............................................................................................................6
4.2、施工准备工作......................................................................................................7
4.3、施工协调管理......................................................................................................9
4.4、施工现场平面布置............................................................................................11
5、施工组织................................................................................................................11
5.1、项目管理层的组织与选派................................................................................12
5.2、项目质量管理的思路与措施............................................................................12
6、主要项目施工方法................................................................................................14
6.1、外墙铝塑板安装施工工艺................................................................................14
6.2、门头灯箱............................................................................................................21
6.3PVC及水晶亚克力字安装:
.................................................................................27
6.4发光字安装施工工艺...........................................................................................28
二、施工进度计划及保证措施..................................................................................42
1、施工进度计划........................................................................................................42
2、组织管理措施........................................................................................................42
3、全程管理措施........................................................................................................43
4、后勤保障措施........................................................................................................44
三、质量保证措施....................................................................................................45
1、概论....................................................................................................................45
2、施工质量保证措施................................................................................................45
3、全程实施质量预控措施........................................................................................46
四、安全保证措施......................................................................................................46
1、安全管理方针与安全管理目标............................................................................46
2、安全生产组织措施................................................................................................47
3、安全生产技术措施................................................................................................48
4、安全保证体系........................................................................................................48
5、安全管理措施........................................................................................................50
6、现场安全防护措施................................................................................................51
7、施工现场安全用电措施........................................................................................54
8、现场安全保卫措施................................................................................................55
................................................................................................55
、其它方面技术措施9.
五、劳动力安排计划及措施......................................................................................56
1、劳动力安排............................................................................................................56
2、劳动力管理措施....................................................................................................56
主要劳工力安排计划表..............................................................................................57
六、主要材料、构件计划..........................................................................................58
七、主要机具使用计划..............................................................................................59
1、机具设备的使用管理............................................................................................59
2、主要机具计划表见下页。
....................................................................................59
主要机具使用计划表..................................................................................................60
八、现场文明施工措施..............................................................................................61
4.1、施工完毕清理现场,达到卫生要求。
............................................................62
应急预案......................................................................................................................63
一、应急准备..............................................................................................................63
二、现场人员伤害抢救实施办法..............................................................................64
(1)、高空坠落........................................................................................................64
(3)、触电................................................................................................................65
(4)、机械伤害........................................................................................................65
五、事故的调查、处理..............................................................................................68
六、应急小组成员名单、职责、联系电话..............................................................68
安全责任承诺..............................................................................................................69
服务实施承诺..............................................................................................................71
附表1:
拟投入的主要施工机械设备配置...............................................................72
附表2:
拟投入的主要仪器仪表配置.......................................................................73
附表3:
拟投入的施工用车辆配置...........................................................................74
6.1项目管理团队......................................................................................................76
附表1:
项目管理机构人员组成表...........................................................................76
附表2:
项目经理简历表...........................................................................................76
附表3:
拟配备的主要人员情况表(含技术人员、主要施工人员等)..............76
附表1:
项目管理机构人员组成表...........................................................................77
附表2:
项目经理简历表...........................................................................................78
附表3:
拟配备的人员情况表(含技术人员、主要施工人员等).......................79
技术条款偏离表..........................................................................................................80
应答文件密封性检查暨签收表..................................................................................81
注:
提交应答文件时需单独提交,手写,无须盖章..............................................81
6.2其他......................................................................................................................82
施工组织设计
1、编制目的及依据
的目制编、1.1.
本施工组织设计编制的目的是:
为2017-2019年渠道门头制作投标阶段,提供较为完整的纲领性技术文件,一旦我公司中标,将在此基础上进行深化,用以指导工程施工与管理,确保优质、高效、安全、文明地完成该工程的建设任务。
1.2、编制内容
本施工组织设计内容包括项目组织机构设置、施工部署、现场布置和管理、施工目标、施工进度计划安排、劳动力及机械设备配置、主要施工方案、方法、质量、安全和文明施工等自开工至竣工的全过程组织管理措施。
1.3、编制依据
1.3.3、我公司承建类似工程长期积累的施工经验;
1.3.4、我公司各项资源配备以及本地区可利用资源和施工现场实际情况;
1.3.5、本工程所涉及的主要国家或行业规范、规程、标准、图集等(不限于此):
《中华人民共和国广告行业标准》
《中国广告协会行业标准》
《建筑装饰装修工程质量验收规范》
《钢结构工程施工质量验收规范》
《建筑电气工程施工质量验收规范》
《中国移动社会渠道门头设计SI规范手册2015版》
)JGJ81-91(》程规接焊构结钢筑建《
《钢结构高强度螺栓连接的设计、施工及验收规程》(JGJ82-91)
《钢结构制作工艺规程》(DBJ08-216-95)
1.4、编制原则
2、工程概况
2.1、工程名称:
2017-2019年渠道门头制作。
2.2、建设单位:
2.3、承包方式:
包工包料
2.4、质量要求:
优良
2.5质保要求:
工程经验收合格交付使用后,承包方承诺保修期限2年,在保修期内,承包方负责对所建设工程免费保修。
2.6施工周期要求:
8小时内响应(到现场勘查),接到需求后,2天内完成从响应到出具预算及效果图方案;甲方确认方案2天内完成制作完成(含安装)。
3、工程特点分析
3.1、工期紧:
根据本工程的实际结合我公司的情况我司确定投标工期为接到需求后,2天内完成从响应到出具预算及效果图方案;甲方确认方案2天内完成制作完成(含安装)。
施工过程中必须合理安排各阶段的工作时间及相互交接时间,且明确。
工竣期如程工证保以,间时接交迟最的序工各.
3.2、构件品种多:
本工程因各种钢构件均需工厂加工制作,然后装箱运输至工地,各种构配件必须有组织、有计划按图纸要求分类编号,小构件须分类打包做到有条不紊。
3.3、施工时节跨冬季雨季:
本工程的施工将跨冬雨季时节,在施工过程中需充分做好防雨准备,确保钢构件施工的顺利进行。
4、施工部署
4.1、实施目标
为充分发挥企业优势,科学组织安装作业,我们将选派高素质的项目经理及工程技术管理人员。
按项目法施工管理,严格执行ISO9001:
2000质量保证体系,积极推广新技术、新工艺、新材料,精心组织,科学管理,优质高效地完成施工任务,严格履行合同,确保实现如下目标。
2天完成设计2天完成制作安装。
4.2、施工准备工作
(1)、根据建设单位意图,了解其总体设想,并根据安装专业施工图进行施工。
(2)、积极参与图纸会审,及时提出问题请求答复,并积极向建设单位推荐优秀设计效果图。
(3)、设计过程中,根据建设单位的意图,积极协助建设。
货定、型选行进料材种各对位单.
(1)、根据经建设单位审核的施工图纸要求积极采购原材料,所有原材料的供应必须符合ISO9001;2000质量标准要求。
(2)、原材料采购过程中,如某些材料市场未能采购到,应积极同业主联系,在业主签字认可的情况下遵循等强度代换原则方可使用。
(3)、所有采购材料必须索取材料分析单,检验书等合格证明文件。
(1)、钢构件开始制作前,应安排相关人员进行技术交底工作。
(2)、技术交底完工后,根据工程设计要求编制详细的制作工艺方案,提出施工机具要求及安排制作人员、焊接材料等工作。
(3)、因本工程钢构件为厂内制作,厂外安装,所以钢构件制作应详细区分各安装单元构件,制作完工后根据(GB50205)验收签发构件合格证。