CPMM土建设计规范
SINOIRONPROJECT
TobecompletedbytheSupplier:
DocumentTitle:
AREA70–INFRASTRUCTUREMINECONSTRUCTIONVILLAGEUTILITIESANDCIVILWORKS-WATERMAIN
SupplierName:
Maunsell
Supplierreasonforissue:
√ForReview&Comment
☐ForInformation
☐FinalHandover(IncludesAs-Builtrecord)
P/OorContractNo.:
SupplierDocID:
740-433-SPEC-3008
SupplierRev:
0
SupplierRevStatus:
-
CPMMDocumentID:
DI-026585
SubmissionNo:
01
TobecompletedbyCPMM:
IAPClassification:
√Project☐Confidential
DateReceived:
17-Apr-2008
Acceptancecertificate:
1
ReviewedandAcceptedasFinal
Certified.Worksmayproceed.
CPMMFinalReviewerSignature:
2
Reviewedandacceptedwithcommentsasnoted.Reviewandresubmit.Worksmayproceed.
3
Reviewedandrevised.Correctand
Printname:
4
Revisenotrequired.Forinformation
Date:
AcceptancedoesnotrelievetheSupplierfromanyresponsibilityorliabilityasstipulatedintheapplicableContractorPurchaseOrder.
resubmit.Worksmustnotproceed.
only.Worksmayproceed.
SpecificationNo.:
740-433-SPEC-3008
WaterMain
CivilInfrastructure
Area70-InfrastructureMineConstructionVillageUtilities&CivilWorks
30June2008
SpecificationNo.:
740-433-SPEC-3008
Preparedfor
CPMiningPty.Ltd.
Ref60046739
Date30June2008
PreparedbyTonyYee
ReviewedbyDalePetherick/AlanJoice
RevisionHistory
Revision
Revision
Date
Details
Authorised
Name/Position
Signature
A
04/07/2008
RossAdamsSeniorProjectManager
0
16/07/2008
ForSubmission
RossAdams
SeniorProject
Manager
MaunsellAustraliaPtyLtd
Level1,629NewcastleStreet,POBox81,Leederville6902,WesternAustralia
T+61892816100F+61892816295
ABN20093846925
©MaunsellAustraliaPtyLtd2008
TheinformationcontainedinthisdocumentproducedbyMaunsellAustraliaPtyLtdissolelyfortheuseoftheClientidentified
onthecoversheetforthepurposeforwhichithasbeenpreparedandMaunsellAustraliaPtyLtdundertakesnodutytooracceptsanyresponsibilitytoanythirdpartywhomayrelyuponthisdocument.
Allrightsreserved.Nosectionorelementofthisdocumentmayberemovedfromthisdocument,reproduced,electronicallystoredortransmittedinanyformwithoutthewrittenpermissionofMaunsellAustraliaPtyLtd.
Specification740-433-SPEC-3008-WaterMain
Area70-InfrastructureMineConstructionVillageUtilities&CivilWorks
G:
\60046739-CapePrestonInfrast\8IssuedDocs\8.3Specifications\SpecificationsforIron
Infrastructure\WaterMainSpec-Rev0.doc
Revision030June2008
TableofContents目录
1.0GeneralRequirements概要要求1
1.1
Scope范围
1
1.2
WorkIncluded工作内容
1
1.3
Approvals批准
1
1.4
AccreditationRequirements鉴定要求
1
1.5
StandardsofMaterialsandWorkmanship材料和作工标准
1
1.6
HandlingandStoring处理和保存
3
1.7
TransportandOffloading运输和卸载
3
1.8
OperatingConditions运转状态
4
1.9
Inspection检测
4
2.0SteelPipe钢管4
2.1
PipeManufacture钢管制造
4
2.2
Certification证明
4
2.3
SpoolingFabrication前期准备
5
2.3.1
General概述
5
2.3.2
PipeSizes钢管的尺寸
5
2.4WeldingProcedures焊接程序5
2.4.1
General总则
5
2.4.2
SetUpforWelding焊接的安装
5
2.4.3
PipeSpoolPieces钢管线轴片
5
2.4.4
ProcedureQualificationTests程序合格测试
5
2.4.5
Identification鉴定
6
2.5
Tolerances偏差
6
2.6
Flanges法兰
6
2.7
MildSteelBolts,NutsandWashers碳钢螺栓,螺母和垫圈
6
2.8
ThreadoletesandPipeNipplesThreadoletes和管道加油嘴
7
2.9
ShopWeldInspectionandRepair焊接检测和修理
7
2.9.1
General概述
7
2.9.2
RepairMethod修理方法
7
2.9.3
InspectionofRepairedWelds修复焊接的检测
7
2.10MagneticParticleTesting磁性粒子测试7
2.10.1
General总则
7
2.10.2
Access进入
7
2.10.3
Reports报告
7
2.10.4
LimitsofDefectiveWelds缺陷焊接限定
7
2.11SurfaceProtectiontoMildSteelPipeandFittings低碳钢管道表面保护8
2.11.1
General总则
8
2.11.2
SurfacePreparation表面护理
8
2.11.3
Pickling酸洗
8
2.11.4
ApplicationofGalvanisedCoating镀锌
8
2.12Works,HydrostaticTesting机件静水力学测试8
2.12.1
General总则
8
2.12.2
Records记录
9
2.12.3
Failure不合格
9
2.13RepairofCoatings涂层修复9
2.13.1
General概述
9
2.13.2
GalvanisedCoatingRepair镀锌涂层修复
9
2.13.3
OtherCoatingRepair其他的涂层修复
9
3.0PVCPipe聚氯乙烯管道9
3.1
General总则
9
3.2
Jointing焊接
10
3.3
PipeGuarantee管道保证书
10
3.4
FlangesandGaskets法兰和垫圈
10
3.5
FerruleStraps(TappingBands)套圈
10
4.0DuctileIronFittings球墨铸铁配件11
Specification740-433-SPEC-3008-WaterMain
Area70-InfrastructureMineConstructionVillageUtilities&CivilWorks
G:
\60046739-CapePrestonInfrast\8IssuedDocs\8.3Specifications\SpecificationsforIron
Infrastructure\WaterMainSpec-Rev0.doc
Revision030June2008
4.1
General总则
11
4.2
TestingofCoatingSystem涂层系统检测
11
4.3
SocketedJoints承口套接
11
4.4
Acceptance认可
12
4.5
MechanicalJoints机械联合
12
5.0HighDensityPolyethylenePipe(HDPE)高密度聚乙烯管12
5.1
General概述
12
5.2
Jointing焊接
12
5.3
PipeGuarantee管道担保
12
5.4
FerruleStraps(TappingBands)金属带(出钢带)
12
6.0CopperPipes铜管12
6.1
General概述
12
6.2
Jointing焊接
13
6.3
PipeGuarantee管子担保
13
6.4
TappingPoints出钢条款
13
7.0ABS(Acrylonitryle,Butadiene,Styrene)PIPE(硝基,丁二烯,苯乙烯)管道13
7.1
General总则
13
7.2
Jointing焊接
13
7.3
PipeGuarantee管道保证书
13
7.4
FlangesandGaskets法兰螺栓和垫圈
13
8.0
Valves
阀
14
8.1
SluiceValves水阀
14
8.1.1
General总则
14
8.1.2
Marking标记
14
8.1.3
Lining&Coating衬里和涂层
14
8.1.4
Inspection检测
15
8.1.5
Testing测试
15
8.2
BronzeGateValves青铜闸阀
15
8.3
ButterflyValves蝶形阀
15
8.4
Non-ReturnValves非止回阀
16
8.5
FlowMeter流量计
16
8.6
Hydrants消防栓
16
8.7
CoversandBoxes盖子和箱子
16
8.8
Timber木料
17
9.0Concrete混凝土17
9.1
Scope范围
17
9.2
ConcreteMixandStrengthRequirements混凝土配合比及强度要求
17
9.3
Cement水泥
17
9.4
Aggregate骨料
17
9.5
Sand沙子
17
9.6
CementMortar水泥砂浆
17
9.7
SteelReinforcement钢筋
17
9.8
Water水
18
10.0PipeTrenching管沟18
10.1
Alignment排成直线
18
10.2
Safety安全
18
10.3
TimberorSteelSheetingofExcavations挖掘的木料或钢板
18
10.4
ExcavationinTrench开挖沟槽
18
10.5
SpoilfromExcavations挖掘废料
18
10.6
Backfilling–General回填-总则
19
10.7
Backfilling–Trenches回填-挖槽
19
10.8
RestorationafterExcavationand/orBackfilling挖掘后的恢复和回填
20
11.0PipeBeddingandSurround管道衬垫及包裹20
11.1
General总则
20
11.2
Materials材料
20
11.3
Bedding垫层
21
12.0PipeInstallation管道安装21
12.1HandlingandClearing操作与清理21
Specification740-433-SPEC-3008-WaterMain
Area70-InfrastructureMineConstructionVillageUtilities&CivilWorks
G:
\60046739-CapePrestonInfrast\8IssuedDocs\8.3Specifications\SpecificationsforIron
Infrastructure\WaterMainSpec-Rev0.doc
Revision030June2008
12.2
Inspection检查
21
12.3
LineandLevel线和水平
21
12.4
SteelPipeInstallation钢管安装
21
12.4.1
Inspection检查
22
12.4.2
FlangeOrientation法兰方向
22
12.4.3
FieldWelding现场焊接
22
12.4.4
ThreadedJoints线头
22
12.4.5
FlangeBolting法兰螺栓
22
12.4.6
ColdSpringing冷回弹
22
12.4.7
ExpansionJoints伸缩缝
22
12.4.8
PipeSupports钢管支架
22
12.4.9
CorrosionProtection防腐
22
12.5PVCPipeInstallation聚氯乙烯管道安装23
12.5.1
Inspection检查
23
12.5.2
Cleaning清洁
23
12.5.3
Jointing连接
23
12.5.4
DeflectingPVCPipes聚氯乙烯管道的偏离
24
12.6PolyethylenePipeInstallation聚乙烯导管安装24
12.6.1
Inspection检测
24
12.6.2
Cleaning清理
24
12.6.3
Jointing填料
24
12.6.4
DeflectingPolyethylenePipes偏转聚乙烯导管
24
12.6.5
ThermalExpansion热膨胀
24
12.6.6
HydrocarbonContamination碳氢化合物污染
25
12.7CopperPipeInstallation铜管安装25
12.7.1
Inspection检测
25
12.7.2
Cleaning清理
25
12.7.3
Jointing焊接
25
12.7.4
DeflectingCopperPipes铜管偏转
25
12.7.5
ConnectiontoLargerMains主导管连接
25
12.8ABSPipeInstallationABS管道安装25
12.8.1
Inspection检测
25
12.8.2
Cleaning清洗
25
12.8.3
Jointing连接
26
12.8.4
ColdSpringing冷回弹
26
12.8.5
ChangesofDirectionofGrade阶级方向的改变
26
12.8.6
ThermalExpansion热膨胀
26
12.8.7
PipeSupport管架
27
12.9
TemporaryBlankEnds临时毛坯端
27
12.10
SuspensionofWork暂停施工
27
12.11
InstallationofValvesandHydrants阀和给水栓的安装
27
12.11.1General总则
27
12.11.2Cleaning清洁
27
12.11.3BronzeGateValves铜闸阀
27
12.11.4SluiceValves闸门阀
28
12.11.5ButterflyValves蝶式阀
28
12.11.6CheckValves检查阀
28
12.11.7Hydrants给水栓
28
12.11.8Bolting螺栓连接
28
12.11.9BackfillingtoBuriedValvesandHydrants掩埋阀和给水栓的回填
28
12.12
InstallationofFittingsandServiceConnections设备安装和设施连接
28
12.12.1BendsandTees接头和T型架
28
12.12.2ServiceConnections设施连接
29
12.13
ThrustBlocksandAnchors斜撑底座和锚
29
12.13.1ThrustBlocks斜撑底座
29
12.13.2Anchors锚
29
12.14
AsConstructedInformation建造期间的信息
29
13.0FieldTestingofallPipework管道工程的实地测试30
Specification740-433-SPEC-3008-WaterMain
Area70-InfrastructureMineConstructionVillageUtilities&CivilWorks
G:
\60046739-CapePrestonInfrast\8IssuedDocs\8.3Specifications\SpecificationsforIron
Infrastructure\WaterMainSpec-Rev0.doc
Revision030June2008
13.1
General总则
30
13.2
Preparation准备
30
13.3
Disinfectant消毒剂
30
13.4
TestEquipment设备测试
31
13.5
HydraulicTestProcedures水压检查法
31
14.0IncidentalWorks附带工作33
14.1
CoversandBoxAssemblies覆盖物和箱体组装
33
14.2
MarkerPosts标杆
33
14.3
Valves阀门
33
15.0Connection,CompletionandMaintenance连接,完工和养护33
15.1PracticalCompletion实际完工33
AppendixADrawingsListA
Specification740-433-SPEC-3008-WaterMain
Area70-InfrastructureMineConstructionVillageUtilities&CivilWorks
G:
\60046739-CapePrestonInfrast
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- CPMM 土建 设计规范