屋顶安全护栏施工方案
海南三亚电缆0.8MWp光伏安装屋顶护栏施工方案
编制:
复核:
审核:
目录
一、编制依据、范围、原则 ............................................................................................................... 3
1、编制依据 ........................................................................................................................................ 3
2、编制范围 ......................................................................................................................................... 3
3、编制原则 ........................................................................................................................................ 3
二、工程概况 ....................................................................................................................................... 4
三、施工准备 ........................................................................................................................................ 4
1、机械人员准备 .............................................................................................................................. 4
2、材料准备 ........................................................................................................................................ 4
3、技术准备 .......................................................................................................................................... 5
四、质量标准及要求 ......................................................................................................................... 5
1、原材料的质量要求 ..................................................................................................................... 5
2、施工过程中的质量控制标准 ................................................................................................... 5
五、护栏施工工艺 ............................................................................................................................. 6
1、施工工艺流程 .............................................................................................................................. 6
2、注意事项 ......................................................................................................................................... 8
六、护栏质量检验标准 ................................................................................................................. 8
七、质量保障措施 .............................................................................................................................. 9
1、工程质量目标 ............................................................................................................................. 9
2、工程质量保证措施 ................................................................................................................... 9
八、安全保障措施 ........................................................................................................................... 11
1、安全管理目标 ........................................................................................................................... 12
2、安全管理体系 ........................................................................................................................... 12
3、安全保障措施 ............................................................................................................................ 14
九、文明施工、环境保护措施 ................................................................................................... 16
1、文明施工措施 ............................................................................................................................ 16
2、环境保护措施 ............................................................................................................................ 18
护栏施工方案
一、编制依据、范围、原则
1、编制依据
本施工方案编制依据有下列文件:
1.1、业主《招标文件》;
1.2、我公司与业主签定的施工合同;
1.3、国家颁布的有关法律法规;
1.4、施工安全操作规程;
1.5、护栏竣工验收办法;
1.6、我单位对施工现场实地勘察、调查资料;
1.7、我单位积累的成熟技术、科技成果、施工工艺及同类工程的施工经验;
1.8、我单位可调用到本项目工程的各类资源。
2、编制范围
本施工方案编制范围为海南三亚0.8MWp光伏发电安全施工的屋顶护栏工程。
3、编制原则
认真贯彻业主的指示、指令和要求。
严格遵守招标文件明确的设计规范、施工规范、标准。
坚持技术先进性、科学合理性、经济适用性、安全可靠性与实事求是相结合。
3.1、以施工设计图为主导,经过合理比选,制定的施工组织方案、技术、工艺、措施等切实可行;
3.2、施工设备、人员及技术配置尽量合理,并留有一定的贮存量;
3.3、施工工艺与设计要求相符,并达到完备、先进、可行;
3.4、施工工序、进度安排、作业循环设计等尽量达到安全、优质、高效;
3.5、施工组织设计中做到设备配套、技术优化、工艺创新;
3.6、坚持施工过程中严格管理的原则,严格执行业主和监理工程师的指令。
二、工程概况
海南美亚电缆分布式屋顶光伏发电项目,本项目是美亚电缆厂房屋顶安全护栏作业,全长480米(长为180米,宽为60米)。
三、施工准备
1、机械人员准备
护栏施工机具已经进行维护保养,运转正常。
施工技术人员、质检人员及技术工人已全部到位。
进场设备及人员数量满足护栏施工要求。
2、材料准备
合同要求护栏立柱间距为1.2m,斜撑45度角,上下两横梁。
立柱材料规格为L50*4mm,横梁规格为L50*4mm*1430m;角铝链接件为L50*4/80mm*163个;不锈钢螺栓为M8*25(含2平1弹1螺母)1918套,护栏立柱施工方法采用夹装式。
立柱及横梁均采用铝合金防腐材料,符合《屋领安全设施设计及施工技术规范》。
3、技术准备
施工开始前,我项目部所有工程技术人员熟悉、理解设计图纸以及相关的施工规范,并与施工人员一起到施工现场与设计图纸一一核对,找出所施工各结构护栏设置地点,同时做好施工设备及材料的进场工作,并由项目总工程师作了护栏工程施工技术交底会议,确定了施工方案。
四、质量标准及要求
1、原材料的质量要求
在定做的护栏运往工地前,护栏部件的样品及出厂检验合格证书,必要时按要求进行荷载试验。
2、护栏安装。
先安装夹具,立柱用螺栓连接,安装检验合格后可进行护栏横梁的安装,采用螺栓连接的方法。
3、施工护栏时,必须避免横梁材料砸坏屋领等现象。
五、护栏施工工艺
1、施工工艺流程
夹具安装→立柱安装→横梁安装
1.1、夹具安装
根据施工图纸,安装在固定的位置,调节安装距离,并利用分配方法处理间距零头数。
1.2、立柱安装